ViewTube

ViewTube
Sign inSign upSubscriptions
Filters

Upload date

Type

Duration

Sort by

Features

Reset

207,970 results

Practical Engineering
What Is a Culvert?

Discussing the hydraulics of the humble highway culvert. Culverts are ubiquitous in the constructed world. They seem so obvious ...

10:20
What Is a Culvert?

2,534,506 views

6 years ago

NYS Department of Agriculture and Markets
Culvert Design Using HY 8

Soil and water district technicians will learn how conduct preliminary designs for culverts for farm laneways and access roads.

1:03:05
Culvert Design Using HY 8

13,459 views

3 years ago

Federal Highway Administration USDOTFHWA
Culvert Hydraulics

Culvert Hydraulics: This video shows how culvert design factors influence flow depths and velocities.

44:06
Culvert Hydraulics

192,012 views

10 years ago

Civil Er
Construction Sequence Animation of a Typical Slab Culvert

This video is a simple animatic reference on components of the slab culvert and the construction sequence of the slab culvert.

1:19
Construction Sequence Animation of a Typical Slab Culvert

173,708 views

5 years ago

Autodesk Transportation Infrastructure
Roadway Design in Civil 3D: Culverts, Cross Sections, & Drive | Back to Basics Pt. 7

In this session, we will add culverts along our corridors and create cross-sections as well as cross-section sheets. We will also ...

9:05
Roadway Design in Civil 3D: Culverts, Cross Sections, & Drive | Back to Basics Pt. 7

50,199 views

5 years ago

Ana Juárez Gómez
Culvert structure in HEC-RAS 2D

We introduce today a culvert structure with several pipes. Lots of luck with the modeling and keep it up! Ana.

8:50
Culvert structure in HEC-RAS 2D

30,922 views

3 years ago

Kenneth Lamb
Culvert Analysis 1

The other challenge to our design of our culvert is that we also don't want to interfere with the road subgrade grade, so there's ...

7:08
Culvert Analysis 1

18,990 views

6 years ago

Civil Griffin
How to Size Culverts (using Hydraflow)

This video will teach users how to preliminary size a culvert under a driveway entrance using the Rational Method and AutoCAD ...

12:30
How to Size Culverts (using Hydraflow)

10,383 views

2 years ago

Federal Highway Administration USDOTFHWA
An Introduction to FHWA HY-8 Culvert Hydraulic Analysis Program

The hydraulic design of culverts plays an important role in the safety and resiliency of roadways. When designing culverts, it is ...

5:40
An Introduction to FHWA HY-8 Culvert Hydraulic Analysis Program

18,381 views

2 years ago

CIVIL SMART
BOX CULVERT DESIGN (PART-1)

EXCEL DESIGN SHEETS FOR RESIDENTIAL BUILDINGS/ G+ 1,2,3 AND SO ON , FOR COMMERCIAL BUILDINGS, FOR PUBLIC BUILDINGS USED FOR ...

13:25
BOX CULVERT DESIGN (PART-1)

33,479 views

2 years ago

RCAD Software
Pipe culvert design

An example of designing a pipe culvert, with the GCULVERT program, an add-on for AutoCAD. In addition to cast in place box ...

2:50
Pipe culvert design

1,465 views

3 years ago

Kenneth Lamb
Culvert Overview 2
4:13
Culvert Overview 2

11,703 views

6 years ago

CAD TUTORIAL BD
Culvert Construction Process | Step by Step | Rebar Placement

Construction #Culvert #Animation Hi i am Mahadi Hasan from "CAD TUTORIAL BD". Today i will show an Animation About ...

6:34
Culvert Construction Process | Step by Step | Rebar Placement

81,660 views

4 years ago

Chethan Gowda R K
Design of box culvert

This video contains the complete design of box culvert.

1:06:28
Design of box culvert

84,234 views

5 years ago

Civil MDS
Slab culvert construction sequence on Site || Step By Step construction activities of slab culvert

In this video I have described the complete construction process of slab culvert on site. components of slab culvert abutment slab ...

2:19
Slab culvert construction sequence on Site || Step By Step construction activities of slab culvert

67,393 views

4 years ago

Structures Pro
Box Culvert Design -  Full Course with Design Templates

staadfoundationadvanced #staadPro #RCDC #cad #staad #buildingdesign #concrete #beginners #rcdesign #protastructure ...

12:33
Box Culvert Design - Full Course with Design Templates

7,546 views

3 years ago

12d Model
Dynamic Culvert Designer - Industry Solutions Webinar Series

00:02 Introduction/session overview 03:50 Culvert Outlet Control 04:14 1D Dynamic Culverts 05:57 Culvert Inlet Control 07:54 ...

33:05
Dynamic Culvert Designer - Industry Solutions Webinar Series

3,911 views

8 years ago

Vibhor Shukla
DESIGN & MODELLING OF RCC BOX CULVERT IN STAAD PRO V8i-EASY METHOD

DESIGN & MODELLING OF RCC BOX CULVERT IN STAAD PRO V8i.

10:02
DESIGN & MODELLING OF RCC BOX CULVERT IN STAAD PRO V8i-EASY METHOD

52,720 views

9 years ago

HydroMohsen
Culvert Hydraulic Design Fundamentals Using HY-8

Culvert Hydraulic Design 101 Using HY-8 In this video, I introduce HY-8 — a free FHWA software tool that automates culvert ...

23:28
Culvert Hydraulic Design Fundamentals Using HY-8

3,194 views

1 year ago

ilustraca
RCC Box Culvert Analysis & Design | IRC | Lecture-01 | ilustraca | Sandip Deb

RCC Box Culvert Analysis & Design | IRC | Lecture-01 Please use our new platform- Access our Web-based ...

43:51
RCC Box Culvert Analysis & Design | IRC | Lecture-01 | ilustraca | Sandip Deb

9,193 views

9 months ago